Case study / Hotel
Significant heating on the A phase of a feeder supplying the hotel's laundry equipment, consistent with a loose and contaminated connection.
Serious
FacilityHotel
ScaleMid-size hospitality property
EngagementAnnual infrared inspection
Max temp146.9°F
Delta T68.1°F
The situation
Inspection of electrical distribution equipment and feeders supplying the hotel's operational areas, including laundry and housekeeping.
The finding
Significant heating on the A phase of a feeder supplying the hotel's laundry equipment, consistent with a loose and contaminated connection.
The outcome
Identified and documented for the client. Corrective action was coordinated. Avoided an unplanned outage that would have interrupted housekeeping and delayed room turnover during active hotel operations.
Related industry: Hospitality and Hotels
Want Infinite Infrared to inspect your facility?
See how an electrical infrared inspection can help identify developing problems before they become outages or safety concerns.
Ready to find the problems before they find you?
See a real sample report, or request an inspection for your facility.
