Findings library
Loose connection on an HVAC distribution panel feed
Abnormal heating on the B phase feed of a 480V HVAC distribution panel at a hotel, consistent with increased resistance at a connection.
What was found
Thermal imaging identified abnormal heating on the B phase feed supplying HVAC equipment serving the hotel. Although the exact failure mechanism was not verified because repairs were performed by the client, the thermal pattern was consistent with increased resistance at the connection.
Why it mattered
This feed supplied HVAC equipment serving guest areas of the hotel.
Potential consequences
Loss of HVAC equipment could affect guest comfort and hotel operation.
Recommendation
Inspect, disassemble, clean and reassemble to proper component torque.
Have similar equipment at your facility?
Infinite Infrared can inspect electrical distribution equipment, document findings, and provide an equipment list for your maintenance records.
Ready to find the problems before they find you?
See a real sample report, or request an inspection for your facility.
